SPC Nickel Reports Additional Drill Results at the West Graham Project, Sudbury, Ontario
Current drilling continues to confirm and upgrade near-surface mineralization with all mineralized intervals exceeding the average grade of the in-pit resource published in our maiden Mineral Resource Estimate in
Highlights:
- Hole WG-24-092, intersected 1.15% Ni and 0.29% Cu over 12.0 metres from 15.0 to 27.0 metres. This interval is part of a wider interval that returned 0.75% Ni and 0.24% Cu over 34.85 metres from 1.15 to 36.0 metres (Table 1).
"The exploration drilling results announced today continue to underscore the
Assay Results
Table 1: New assay results from the 2024 drill program on the
HOLE ID |
From |
To |
Length |
Ni |
Cu |
Co |
Pt |
Pd |
Au |
Ag |
Estimated True Width % |
WG-24-089 |
3.50 |
21.00 |
17.50 |
0.55 |
0.40 |
0.02 |
0.07 |
0.02 |
0.02 |
2.34 |
100 |
WG-24-090 |
2.80 |
18.00 |
15.20 |
0.52 |
0.33 |
0.02 |
0.04 |
0.04 |
0.02 |
1.84 |
90 |
WG-24-091 |
2.80 |
19.00 |
16.20 |
0.65 |
0.38 |
0.02 |
0.06 |
0.02 |
0.03 |
2.22 |
75 |
including |
2.80 |
12.00 |
9.20 |
0.81 |
0.36 |
0.03 |
0.07 |
0.02 |
0.02 |
2.24 |
75 |
WG-24-092 |
1.15 |
36.00 |
34.85 |
0.75 |
0.24 |
0.03 |
0.04 |
0.02 |
0.01 |
1.21 |
90 |
including |
15.00 |
27.00 |
12.00 |
1.15 |
0.29 |
0.04 |
0.06 |
0.03 |
0.01 |
1.38 |
90 |
WG-24-093 |
14.00 |
33.00 |
19.00 |
0.76 |
0.24 |
0.03 |
0.04 |
0.02 |
0.02 |
1.21 |
100 |
WG-24-094 |
2.00 |
28.00 |
26.00 |
0.54 |
0.28 |
0.02 |
0.03 |
0.02 |
0.01 |
1.62 |
100 |
including |
14.00 |
23.00 |
9.00 |
0.81 |
0.36 |
0.03 |
0.03 |
0.02 |
0.02 |
1.97 |
100 |
WG-24-095 |
17.00 |
23.00 |
6.00 |
0.51 |
0.29 |
0.02 |
0.05 |
0.02 |
0.03 |
1.58 |
100 |
WG-24-096 |
3.00 |
19.00 |
16.00 |
0.73 |
0.26 |
0.03 |
0.04 |
0.02 |
0.02 |
1.34 |
100 |
WG-24-097 |
4.00 |
26.00 |
22.00 |
0.46 |
0.32 |
0.02 |
0.07 |
0.02 |
0.03 |
2.01 |
100 |
Notes: 1. Length refers to downhole length. Estimated True Width is expressed as a percentage of downhole length. |
|
Table 2: Previously reported assay results from the 2024 drill program on the
HOLE ID |
From |
To |
Length |
Ni |
Cu |
Co |
Pt |
Pd |
Au |
Ag |
Estimated True Width % |
WG-24-086 |
10.00 |
40.00 |
30.00 |
0.46 |
0.25 |
0.01 |
0.05 |
0.02 |
0.01 |
1.84 |
100 |
WG-24-087 |
10.00 |
51.00 |
41.00 |
0.63 |
0.24 |
0.02 |
0.04 |
0.02 |
0.02 |
1.41 |
95 |
including |
32.00 |
48.00 |
16.00 |
1.05 |
0.30 |
0.03 |
0.06 |
0.02 |
0.03 |
1.82 |
95 |
WG-24-088 |
9.05 |
47.00 |
37.95 |
0.87 |
0.32 |
0.03 |
0.05 |
0.02 |
0.02 |
1.95 |
100 |
including |
13.00 |
42.00 |
29.00 |
1.03 |
0.34 |
0.04 |
0.05 |
0.03 |
0.02 |
1.98 |
100 |
including |
20.00 |
36.00 |
16.00 |
1.41 |
0.33 |
0.05 |
0.03 |
0.01 |
0.06 |
1.75 |
100 |
Notes: 1. Length refers to downhole length. Estimated True Width is expressed as a percentage of downhole length. |
About the West Graham Deposit
In
The technical report, titled "Mineral Resource Estimates for the West Graham and LKE Deposits, Lockerby East Ni-Cu-PGM Sulphide Property,
Quality Assurance, Quality Control and Qualified Persons
The technical elements of this news release have been approved by Mr.
About
Cautionary Note on Forward-Looking Information
Except for statements of historical fact contained herein, the information in this news release constitutes "forward-looking information" within the meaning of Canadian securities law. Such forward-looking information may be identified by words such as "plans", "proposes", "estimates", "intends", "expects", "believes", "may", "will" and include without limitation, statements regarding estimated capital and operating costs, expected production timeline, benefits of updated development plans, foreign exchange assumptions and regulatory approvals. There can be no assurance that such statements will prove to be accurate; actual results and future events could differ materially from such statements. Factors that could cause actual results to differ materially include, among others, metal prices, competition, risks inherent in the mining industry, and regulatory risks. Most of these factors are outside the control of
Neither
SOURCE